Al Saiari contracting has structural and piping Fabrication are composed as follows

  • Planning and review: Review of contracting documents, design requirements and approved fabrication drawing in order to identify defects and problems which might come up on the production process or during erection.
  • Welding: Assembled materials for joint welding should be cleaned, and edge preparation to be checked as per approved code. Welding equipments suitable for the process maintained properly to ensure repeatable high quality work.
  • Inspection & Testing: Inspection and testing is carried out by a selected Al Saiari Contacting personal and an approved Third party inspectors with certification when required. All welds shall be visually inspected and measured as necessary.

GRP Piping

We are specialized in installation of GRP, FRP and RTR piping both above and underground with any kind of joints such as Double bell coupling, spigot and lamination joints. For the double bell coupling of big dia underground pipes, testing the leakage by using joint testers before back filling to ensure no leakage. We are doing FGD System and Desalination as a complete package.

H.D.P.E & P.E PIPING

Polyethylene pipes can be produced so that they will be linked by butt weld and fusion weld method depending on the project. We are doing small diameter pipes to 600 mm diameter pipes for various purposes and projects.

Safety Procedures

The management of ALSCO is committed to providing a safe working environment for its employees and other project personnels. Towards the realization of this objective, ALSCO has a strong safety program outlining management leadership, assignment of authority, safety rules and regulations, employee orientation and training. Our goal on every project is to have ZERO incident of injury to or loss of personnel, equipment & material, through the combined efforts of all personnel.

HOME  |   ABOUT US   |  WORKFORCE and STRENGTHS   |   PROJECTS   |   GALLERY   |   CONTACT US